Deflectors Folder (towers)
Deflectors Folder (towers) image
Get Latest Price Request a quote
Quick Details
Product Details
D Bracket
PART 1 GENERAL
1.01 SCOPE
This Specification covers the design, manufacturing, testing supply, delivery and performance requirements of D Bracket for use on overhead networks.
1.02 STANDARDS
The fittings comply with the latest editions of, and amendments to, the standards listed below:
BS – British Standards Institution
BS 3288 – Insulator and Conductor Fittings for Overhead Power Lines
BS EN ISO 1461 – Hot Dip Galvanized Coatings on Iron and Steel Articles
VDE – Verband Deutscher Elecktrotechniker
VDE 0202 – Requirements for aluminum for Electrical Technology
DIN – Deutsche Industrie Normen
DIN 6796 – Conic spring Washers
1.03 SERVICE CONDITIONS
Suitable for outdoor use in the Tropical zone,with a maximum ambient temperature of approximately 30degrees centigrade with heavy rainfall and high humidity of approximately 100% .
1.04 SYSTEM CONDITIONS
Comply the Customer requirment.
1.05 TESTING
A. Routine Tests
1. Routine tests carried out on all units of a particular type.
2. Mechanical routine testing will be carried out in accordance with BS 3288; Part 1.
3. The results of these tests will be recorded on a Routine Test Certificate.
4. Routine Test Certificates will include, in addition to the test results, the Purchaser’s Order Number.
B. Type Tests
1. Type tests will be carried out on individual units of a particular type.
2. Type tests will be in accordance with BS 3288: Part 1.
C. Sample Tests
1. Method of sampling and testing and test parameters shall be in accordance with BS 3288: Part 1.
2. Test results shall be recorded in the same manner as routine tests.
D. Inspection
The Purchaser reserves the right to witness the manufacturing process, any type tests specifically performed on the insulators to be supplied to ECG and any routine tests required in the manufacture and supply of the insulators and fittings. The Supplier shall provide free access to the Purchaser to any site where such manufacturing process, or tests, either type or routine tests are taking place. The Supplier shall bear the in plant costs of such inspection. The Supplier shall provide the Purchaser of a schedule of manufacture and tests at least two weeks before the events are to occur.
1.06 SPARES
(Not Applicable)
1.07 PACKING AND SHIPMENT
Export Standard
1.08 SUBMITTAL
As specified Of Customer
PART 2 PRODUCTS
2.01 DESIGN
According to the Drawing Attach
Recommended for You
Not exactly what you want?
Post Sourcing Request
Hot Searches
High Voltage Electric
Ac High Voltage
High Voltage Motor
High Voltage Power Supply
High Voltage Switch
We are China Deflectors Folder (towers) manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.
Get Latest Price Request a quote
Popular D bracket Products
D Iron D Bracket D Clevis D Shackle with Cotter Pin
Popular High Voltage Fuse Products
Driving Gloves Made of Pigskin Leather
15g Sandy Nitrile Glovesnylonblack 7-11
Simple Clamp 8 "X 1-1 / 2" X 1/4
Popular jgtrade1 Products
U-Shaped Conductor Twisted 90 Degrees
Fuselink, Cartridge 415V - 30 AMPS -Me30A
Climbing Ladder for Metal Pillars.
Overheadlinefittings-Parallelgrooveconnector, Wedgeconnector
Type “ X” Extended Bracket
Popular Pole Line Hardware Products
High Strength Brass T/J Imported Copper Bolt Connector
Wire Rope Thimble Hot-DIP Galvanized or Stainless Steel Heat Shaped
High Conductivity Aluminum Parallel Groove Clamp
VIC Pole Line Fittings Power Cable Accessories Hot Line Clamp Bali Clamp
Hot DIP Galvanized Pole Line Hardware Angle Bracket
Tags: D bracket, High Voltage Fuse, jgtrade1, Pole Line Hardware