Three-Phase Two-Winding 33kv off-Circuit Tap Changing Power Transformers

China 
                        Three-Phase Two-Winding 33kv off-Circuit Tap Changing Power Transformers
                      manufacture and supplier

Three-Phase Two-Winding 33kv off-Circuit Tap Changing Power Transformers image

Get Latest Price Request a quote

Quick Details

Three-Phase Two-Winding 33kv off-Circuit Tap Changing Power Transformers

Silverstone Electric

OD

Power Frequency

Power Transformer

ISO9001-2000, UL, ISO9001, CCC

Separated Winding Transformer

Oil-immersed Type Transformer

Core-type Transformer

Three

Power, Instrument, Lighting, Rectifier

High

Silverstone Electric

Pallet / Wooden Case / Container

Refer to Drawings

China

8504329000

Product Details

Features of 220kV~500kV Oil-immersed Transformers

1. Low loss, low noise
The core laminations are composed of imported high quality grain-oriented cold-rolled silicon steel sheets with miter joints and
the joints are lapped with 5 steps, thus ensuring low loss and low noise. The inside of the tank is lined with shields. Measures
have also been taken for metallic structural parts located in high magnetic field, to reduce stray loss, thereby the total load loss,
and to relieve local overheating.
2. Safe and reliable service
Reliability of the products is the everlasting objective of Silverstone Electric and we ensure that the transformers can be
operated under long service voltage and also under short time overvoltage. Appropriate cooling arrangement and relatively
low current density ensure that the winding temperature rise is much lower, at least 5K, than specified in the national standard.
The mechanical stress in winding conductors during short circuit is also kept well below safe limit. Together with technological
procedures during manufacture and other means to elevate mechanical strength, 220kV~500kV transformers that we
supplies could withstand severe short circuit in all cases during service.
3. Easy erection and maintenance
To minimize erection work at site, Silverstone Electric transformers are so fabricated that lifting the active part out of the tank
for inspection after arrival at site is not mandatory. Besides, all components to be mounted on the transformer at site have
been pre-assembled before dispatch, and all secondary wirings have been laid down into conduits on the transformer and
connected to the terminals in the control cabinet or terminal box. Natural oil circulation and forced air cooling (ONAF) are
generally adapted in our transformers below 480MVA, and 70% nameplate rating can be achieved in case the fans are out of
service. Natural oil circulation is adapted in transformers below 240MVA. Little maintenance work is required for the cooling
devices.
4. Careful fabrication
Vertical winding machines with tension device are used for winding, so that the windings can be wound tightly and therefore
mechanically strong as a whole. All insulation parts subjected to mechanical stress during short circuit, such as spacers in
windings are made with T4 densified pressboard to reduce shrinkage. Individual windings are dried first, followed by a second
drying of the assembled phase block. After core and coil assembly, Vapor Phase Drying (VPD) is once again carried out to ensure
that all insulation parts are thoroughly dried and no further shrinkage is possible to occur during service. All the high voltage
terminals and nearby metallic structural parts are rounded up to prevent partial discharge. High voltage bushing terminals are
contained within turrets, and kept concentric with the turret. All the leads are properly crimped and metallized to be rounded
up. VPD process insures that the moisture content within the transformer is kept at a very low level, and the core and coil
assembly is once more cleaned by condensed vapor flowing down the surfaces. The fabricated tanks are relieved from welding
stress and shot-blasted integrally, so as to be free from oil leakage trouble and to give the tank a clean, pleasant looking
appearance.

We are China Three-Phase Two-Winding 33kv off-Circuit Tap Changing Power Transformers manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.

Get Latest Price Request a quote

Popular Amorphous Transformer Products

Step Voltage Regulator Oil Immersed

11kv D11 Single-Phase Oil-Immersed Transformer

Single Phase Overhead Step up Step Down Distribution Transformer 11kv

33kv Dry Type Power Transformerswith on-Load Tap Changer

Oil Immersed Step Voltage Regulator

Dry Type 33kv Power Transformer with off-Circuit Switch

Popular Oil Transformet Products

Low Loss Oil-Immersed Power Transformer 132kv 126kv 110kv IEC Standard

230kv 132kv 126kv Oil-Immersed Power Transformer

S11 Type 33kv off-Circuit Tap Changing Transformers

11kv 12kv 15kv 30~500kVA Distribution Transformers

33kv Oil-Immersed Power Transformer

330kv Three Phase off-Circuit Tap Changing Power Transformers

Popular Power Transformer Products

Dry Type Medium Voltage Power Distribution Transformers

3D Delta Core Dry-Type Transformer29

Three Phase 33kv Tap Changer Power Transformers

Intelligent Capacity Regulate & Tap Change Oil Immersed Power Transformer

Three Phase Overhead Pole Mounted Distribution Transformer 11kv

Low Loss 11kv - 230kv Rectifier Special Transformer

Popular silverstone-electric Products

En131 Standard Extension Fiber Glass Step Ladder

110kv and Above Rectifier Special Transformer

33kv Porcelain Disc Suspension Insulator for High Voltage

33kv to 220kv Polymer Housed (Series YH) & Porcelain Housed (Series Y) Metal Oxide Surge Arrester for Neutral of Transformer

Aerodynamic Suspension Ceramic Porcelain Insulator

250-2500kVA 11kv on-Load Tap-Changer Distribution Transformer

Tags: , , ,

FAST AND RELIABLE SERVICE FOR YOUR PROJECT

Contact our trained experts today to find your perfect power solution.

ASK A QUESTION