Basic Info.

Model NO.
sz-200kva/10kv

Usage
Power Transformer

Frequency Characteristics
Power Frequency

Shape of Core
Ring

Brand
Ville

Regulating
200kVA Power Transformer

Oil Immersed
10kv

Transport Package
Wooden Cases

Specification
IEC CE, ISO

Trademark
ville

Origin
Ningbo China

HS Code
8504231100

Production Capacity
50000 Sets/Year

Product Description

General:

The SZ series load regulating power transformer is developed and produced according to the requirement of the market. It can be widely

used in urban & rural, industrial & agricultural power network, which has a great significance for energy-saving and environment

protection.

The lamination method of this product’s iron core is ladder form, instead of the traditional iron core lamination technology, which improves the

magnetic circuit distribution inside the iron core. It can be seen as a revolution of transformer iron core manufacturing.

Compared with the traditional, the no-load loss, no-load current and noise of the new one decrease 20% respectively, and load loss

decreases 10%. The new product applies CAD, with advance design, reasonable structure, and excellent materials. Each index complies

with the standards of GB1094-1996 “Power Transformer” GB/T6451-1999 “Technical Parameters and Requirements of Three-phase Oil-

immersed Type Power Transformer”. Now its level is n the leading position of our country.

 

1. Application
The three phase oil-immersed transformer 200kVA/10kV .After normal transportation, the assembly can be made with dismounted
component without untanking inspection. It can be put into operation after acceptance factory test.

2. Service condition
Normal service condition
2.1 Elevation Height: up to 2000m
2.2 Ambient temperature:Max.temperature:+40 °C
Max. average daily temperature+30°C
Max. average annual temperature +20 °C
Min.temperature:-30°C
2.3 Service site :outdoor.
2.4 Symmetry of power source

3.The voltage of power source for the three phase transformer shall be approximately symmetrical.

4. Parameters and outline dimension ( refer to table 1,2,3,4)


5. Transportation
5.1 Road and railway transportation are two ways to deliver transformer to installation site, which is normally full of oil during the
transportation. Attached accessories, fittings and related documents shall be packed with trans
former for delivery.
5.2 Four lifting lugs on the tank wall, bearing the total weight of transformer, shall be used at the same time when the transformer is lifted.
The lifing block is only used for the active part, the angle between the lifting rope and 
vertical line shall not be more than 15°.
6. Acceptance and storage
After receipt of transformer, its type, specification shall be inspected by the purchaser according to the nameplate &contract. The related
technical documents and accessories shall be checked according to the list of ex-works 
documents. The inspection shall be carried out as following:
6.1 No oil leakage.
6.2 No damage both product and accessories
6.3 Parts of product such as temperature controller, bushing, Buchholz relay (for products above 630kVA transformer), temperature
indicator (for products above 1000kVA transformer) and so on.

6.4 During the storage of transformer, the oil level shall be kept to the level of cover and regular inspection shall be done. For the
dismantled transformer during the transportation, the conservator must be mounted due to the oil 
pressure and its volume varying with
the different temperature when the transformer is put into operation.

6.5 Voltage withstand test has been carried before the deliverv from the factorv according to IEC60076-3. Ifit is necessary to cary out the
test again by the client, its applied value shall be 80% of ex-work testing value.

7. Installation and Maintenance
7.1 The test items could be carried out before the operation when the transformer is delivered without any dismantling.
7.2 W hen the mercury thermometer and temperature controller are installed, oil shall be filleld into the pocket of transformer.
7.3 The oil shall be added into the lower part of it when the breathing dehydrator is mounted. Refer to the operation manual of breathing
dehydrator.

7.4 Others are to be put on.
7.5 The height of oil level shall be inspected when the oil level is lower than the normal position. Open the plug of conservator and fill in
the high quality oil to the normal level inside the conservator.

7.6 The draining plug of Buchholz relay shall be sealed well after oil filling. Please check all the sealing surface and rest 24 hrs to check
the leakage, exhaust air from the Buchholz relay again. Attention to the type,
manufacturing place of refilling oil when the oil is refilled.
The different type of oil shall not be used and 
mixed.
7.7 Oil sample shall be taken for test and analysis.
7.8 Testing notice

Order Instructions

When you choose our company product, please offer following data:

Transformer model:                     

Rated capacity:                     kVA

Phase       :    Three-phase

  • Single-phase

Frequency   :     50HZ

  •  60HZ

Rated voltage ( H.V. / L.V. ):                

Tapping range: ±       ×       %

Insulation level: LI       AC       / LI       AC        kv

Veotor group:  Dyn11

             Yyno

             Other

Short-circuit Impedance:        %

Cooling method:  ONAN

                ONAF

Tapping method:  OLTC

                OCTC

                Other

Other requirement:                                            

Notes:

  1. We also can design special products according to customer’s particular requirements.
  2. The final dimension is subject to outline drawing.

  

Thanks for choosing VILLE as your reliable partner and please trust both

of us will create a brilliant future!
/* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(“,”).forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1

We are China 200kVA 10kv Three Phase Oil Immersed on Load Tap Changer Power Transformer manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.

Get Latest Price Request a quote

Popular 200kVA 10kv Three Phase Oil Immersed on Load Tap Changer Power Transformer Products

  • No related articles
  • Popular 200kVA Transformer on Load Tap Changer Products

  • No related articles
  • Popular cnville Products

    Lgbj-35W2 Oil-Immersed Structure Current Transformer/Current Transformer

    Sfz10-10000/110 10mva 110kv Dual-Winding Load Tapping Power Transformer

    Oil Type Single Phase Shunt Reactor Power Plant 72.5kv 45mva

    Zmd High-Quality on-Load Tap-Changer Below 252kv for Three Phase Neutral Point Voltage Regulation

    72.5kv/630~1250A Oip Condenser Transformer Bushing (Draw lead) Brdlw

    Sz11-4000/35 4mva Sz11 Series 35kv Power Transformer with on Load Tap Changer

    Popular Oil Immersed Transformer Products

    Single-Phase Oil Immersed Power Transformer

    Vacuum Permanent-Magnet (horizontal) On Load Tap changer for Oil-immersed Transformer

    Amorphous Alloy Iron Core Oil-Immersed Power Transformer

    11kv S13-M Sealed Oil Immersed Transformer

    11kv Oil Immersed Power Transformer

    250kVA 315kVA 10kv on Load Tap Changer Distribution Transformer

    Tags: , , ,

    FAST AND RELIABLE SERVICE FOR YOUR PROJECT

    Contact our trained experts today to find your perfect power solution.

    ASK A QUESTION