Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch

China 
                Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch
              manufacture and supplier

Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch image

Get Latest Price Request a quote

Basic Info.

Model NO.
SHZV

Rated Voltage
4kv

Applicable Standard
IEC CE, ISO

Transport Package
Wooden Cases

Specification
According to specification

Trademark
VILLE

Origin
Ningbo

HS Code
85

Production Capacity
50000 Sets

Product Description

SHZV Vacuum On-Load Tap Changer For Oil Immersed Transformers
switch

 

General

Until now, the oil-immersed on-load tap changer (hereinafter referred to as OLTC), being widely used in
worldwide substation, inside which the oil is an insulation medium for OLTC themselves 
and for extinguishing arc
occurred on the main switching contacts and transition contacts, as well 
as a medium for lubrication of
mechanical parts and for cooling of contacts and all other currentcarrying 
parts. Therefore, this type OLTC is
also called the OLTC of arc-extinguishing inside the 
oil. The carbonization of oil for this type of OLTC is
inevitable during the operating of tap changer. 

With the switching times increasing, inside the OLTC oil chamber there will be more and more carbonizations.
Therefore, except from neutral point connection, in application for other winding 
connections of transformer, or
power transformer with voltage of 220kV or above, the auxiliary 
device like online oil filter plant has to be
assembled with the oil-immersed OLTC in order to 
guarantee the insulation level of oil and to decrease the
carbon granule. When this kind of OLTC 
is used in the rectification and furnace transformer, it operates very
frequently under the full-load 
or even over-load, which quickens the wearing-out of arcing contacts, the
carbonization of oil and 
also the wearing-out of mechanical parts. As a result, such works as continual changing
of new 
oil and replacement of arcing contacts, frequent inspection and maintenance have to be done to make the
OLTC reliable, even 
replacing the new OLTC within the service life of transformer, the cost for maintaining its
normal operation is quite expensive.

The type of oil-immersed and vacuum arc-extinguishing OLTC-SHZV, with arc contacts replaced by

vacuum interrupter, has very prominent advantages:

1. The current breaking in the vacuum interrupter, and the arc produced also extinguishing in the vacuum
interrupter, which solved the problem of oil carbonization. Therefore there is no need to equip with online filter
plant under any application condition.

2. Since the carbonization of oil in the oil compartment is eliminated, the carbon granule adhered to the surface
of insulation material does not exist any longer, the insulation level is guaranteed.

3. The task of carrying current for long time is undertaken by special mechanical main contacts while the
vacuum interrupter only taking the current instantly through, so the overload capacityof OLTChas been
improved greatly.

4. All the vacuum interrupters are fixed firmly and mal-operation will not happen.

The highest voltage of the OLTC is 252kV, three-phase OLTC is application for neutral point winding connection
of transformer with voltage up to 550kV, and single-phase OLTC can be used for any selectable winding
connection, the max. rated through current of tap changer is 1000 Amp. in three-phase and 2400 Amp. in
single-phase.
SHZV structure is the combined type and is composed of diverter switch and tap selector.SHZV is installed on
the top cover of transformer by its head flange, and connected to SHM-III motor drive unit through the upper
gear box on the cover of OLTC, bevel gear (auxiliary devices) and driving shaft (horizontal & vertical), realizing
the switching operation of OLTC by motor or remote control.

This operation instruction includes all the necessary information for the installation and operation of SHZV
OLTC. The structure is subject to change without notice.

Designation of the tap changer model number

 

The operating condition of OLTC

a. The temperature of oil in which the tap changer operates is – 25ºC ~ 100ºC .

b. The ambient temperature under which the tap changer operates is – 25ºC ~ 40ºC .

Technical Data of Type SHZV

Mechanical operating principle of the tap changer

Tap change operation begins with the motor of motor drive unit, the driving force is transmitted to the bear gear
box through the vertical driving shaft, then transmitted to the retarding mechanism 
on the head flange via the
horizontal driving shaft, and its output shaft drives the insulation shaft 
rotate. The rotation of insulation shaft
then drives the main driving system to operate the spring 
accumulation mechanism (the energy released from
the energy-storing mechanism drives the 
diverter switch operate), and the Geneva wheel mechanism of tap
selector, the rotating of Geneva 
wheel mechanism makes the singular or dual moving contact of tap selector
rotate one operating 
position.

Maintenance period

1.Maintenance should be carried on every 300,000 operations of tap changing.

2.Diverter switch should be replaced after 800,000 operations.

3.Maintenance should be carried on tap selector after 800,000 operations.

4.The maintenance of the tap changer is normally performed by Huaming. And usually the maintenance can be
finished within one day.

 

Company Profile:

Main product line: Tap changer and HV switchgear

Tap changer manufacturing with fullest vertical integration

Tap Changer Products Range On-Load Tap Changer:

* Conventional OLTC for transformer with voltage up to 765kV

*Vacuum OLTC for oil transformer with voltage up to 765kV

*Vacuum OLTC for dry transformer with voltage of 72.5kV

Off-Circuit Tap Changer

* Application for the transformer with voltage up to 765kV

Our Services

1. Pre sale service
a. make technical solution
b. send quotation, technical data sheet and drawing
c. prepare power transmission plan, testing plan and shipment plan
2. In sale service
a. supervise the manufacturing schedule totally in accordance with the plan
b. send photos to customer during every manufacturing process(hold point)
c. inform the customer one week before testing.
3. After sale service
a. installation and commissioning, training the workers
b. quick response within 12 hours any time
c. provide 12 months guarantee period normally.

FAQ

1. Q: What is your delivery time ?
A: Depend on the type of transformer.
2. Q: What is your payment term?
A: 30% advance by T/T , 70% before delivery by T/T or L/C or we can discuss about it.
3. Q: What kind of standard you follow?
A: IEC, ANSI, CSA, GB, etc
4. Q: What kind of supporting documentation you can provide normally
A: Quotation, outline drawing, manufacturing plan, quality control plan testing plan, financial report, type test report(KEMA, CESI),reference list, etc
5. Q: What is your normal warranty period?
A: 12 months after transformer operation.
6. Q: Can u do installation and commission in user’s site?
A: Yes, we can send our installation team to user’s country for service.
7. Q: Do you have any experience in this kind of transformer?
A: Yes, we can provide reference list for check.

Our advantages:

Quality Assurance

–From the very beginning, VILLE ensures quality in every step to achieve the best quality.

 Experience Sharing

–With more than 30 years’ experience in power industry, VILLE brings you an optimized solution.

 Global Service

–Wherever you are, VILLE global network will support and provide you with value.

 Quick Response

–In response to your needs without delay, VILLE  knows the value of your time.

Thanks for choosing VILLE as your reliable partner and
please trust both of us will create a brilliant future!

/* January 22, 2024 19:08:37 */!function(){function s(e,r){var a,o={};try{e&&e.split(“,”).forEach(function(e,t){e&&(a=e.match(/(.*?):(.*)$/))&&1

We are China Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.

Get Latest Price Request a quote

Popular cnville Products

S11-M-200/20 0.2mva 20kv Multi-Function High Quality Distribution Transformer

S9-25000/35 25mva S9 Series 35kv Power Transformer with on Load Tap Changer

S9-5000/35 5mva S9 Series 35kv Power Transformer with on Load Tap Changer

Tyd66/ 3 -0.02W3 Tyd66 Type Capacitor Voltage Transformer

69kv -13.8kv Power Transformer Mineral Oil From 20mva24mva 25mva 32mva Transformer Oil Immersed Transformer

S9-Ms-1250/10 1.25mva S9-Ms Series 6kv/10kv Petrochemail Power Transformer

Popular Shzv Vacuum on-Load Tap Changer for Oil Immersed Transformers Switch Products

  • No related articles
  • Popular Tap Changer for Transformer Products

    Oltc Vacuum on Load Tap Changer for Power Transformer, Zm, Zmb, Zmd Type

    Wdl off-Circuit Tap Changers for Transformers/ Transformer Switch

    off-Circuit Tap Changer for Transformers Distrubution Transformer Switch

    Wsl off-Circuit Tap Changers for Transformers

    Vacuum on-Load Tap Changers for Oil Immersed Transformer Switch off Circuit Tap Changer

    Wsl Head Motorized off-Circuit Tap Changer for Transformers

    Popular transformer tap changer Products

    off-Circuit Cage-Form Tap-Changer Circuit Switch Distribution Transformer off Load Tap Changer

    off-Circuit Capacity Regulating Tap Changer Circuit Switch

    Vacuum on-Load Tap Changers for Oil Immersed Transformers Switch Cm2 Oltc

    Vacuum on-Load Tap Changer for Voltage Regulating by Change Tap Position

    Wsl off-Circuit Tap Changers for Transformers

    10KV TGV II Dry-Type Vacuum On Load Tap Changer Switcher

    Tags: , , ,

    FAST AND RELIABLE SERVICE FOR YOUR PROJECT

    Contact our trained experts today to find your perfect power solution.

    ASK A QUESTION