PART 1 GENERAL
1.01 SCOPE
This Specification covers the design, manufacturing, testing supply, delivery and performance requirements of D Bracket for use on overhead networks.
1.02 STANDARDS
The fittings comply with the latest editions of, and amendments to, the standards listed below:
BS – British Standards Institution
BS 3288 – Insulator and Conductor Fittings for Overhead Power Lines
BS EN ISO 1461 – Hot Dip Galvanized Coatings on Iron and Steel Articles
VDE – Verband Deutscher Elecktrotechniker
VDE 0202 – Requirements for aluminum for Electrical Technology
DIN – Deutsche Industrie Normen
DIN 6796 – Conic spring Washers
1.03 SERVICE CONDITIONS
Suitable for outdoor use in the Tropical zone,with a maximum ambient temperature of approximately 30degrees centigrade with heavy rainfall and high humidity of approximately 100% .
1.04 SYSTEM CONDITIONS
Comply the Customer requirment.
1.05 TESTING
A. Routine Tests
1. Routine tests carried out on all units of a particular type.
2. Mechanical routine testing will be carried out in accordance with BS 3288; Part 1.
3. The results of these tests will be recorded on a Routine Test Certificate.
4. Routine Test Certificates will include, in addition to the test results, the Purchaser’s Order Number.
B. Type Tests
1. Type tests will be carried out on individual units of a particular type.
2. Type tests will be in accordance with BS 3288: Part 1.
C. Sample Tests
1. Method of sampling and testing and test parameters shall be in accordance with BS 3288: Part 1.
2. Test results shall be recorded in the same manner as routine tests.
D. Inspection
The Purchaser reserves the right to witness the manufacturing process, any type tests specifically performed on the insulators to be supplied to ECG and any routine tests required in the manufacture and supply of the insulators and fittings. The Supplier shall provide free access to the Purchaser to any site where such manufacturing process, or tests, either type or routine tests are taking place. The Supplier shall bear the in plant costs of such inspection. The Supplier shall provide the Purchaser of a schedule of manufacture and tests at least two weeks before the events are to occur.
1.06 SPARES
(Not Applicable)
1.07 PACKING AND SHIPMENT
Export Standard
1.08 SUBMITTAL
As specified Of Customer
PART 2 PRODUCTS
2.01 DESIGN
According to the Drawing Attach
Recommended for You
Not exactly what you want?
Post Sourcing Request
Hot Searches
High Voltage Electric
Ac High Voltage
High Voltage Motor
High Voltage Power Supply
High Voltage Switch
We are China Dgl Pole Top Rain Cap manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.
Get Latest Price Request a quote
Popular D bracket Products
Hot DIP Galvanized D Bracket for Shackle Insulators
D Iron D Bracket D Clevis D Shackle with Cotter Pin
D Iron/Secondary Rack Swinging Clevis Bracket for Insulator
Dtl-1 Cu-Ai Connecting Terminal
Popular High Voltage Fuse Products
Square Frame Type Spacer-Dampers for 500kv Lines
Splicing Sleeves for as. Stranded Wire
Polyester Lined Glove Coated with PU (black)
AC Outdoor High Voltage Fuse Cut-out 11kv Drop out Fuse with Polymer Insulator
Cross Type Spacer-Dampers for 500kv Lines
Popular jgtrade1 Products
Arc Chute Type Fuse Polymer Type
Gang Operated Air Break Switches 75kv
High-Voltage Disconnector Switch 126kv
57-1 Post Type Porcelain Insulator
Popular Pole Line Hardware Products
Hot DIP Galvanized 8-Way Bust Expanding Anchor Pole Line Hardware
Round Washer HDG Pole Line Hardware
Guaynaa for Self-Tightening Clamps for Optical Truss (OPGW)
Socket-Clevis Eye HDG W/Ws Type Pole Line Hardware
Copper Aluminum Specific Form Parallel Groove Pipe Clamp
Tags: D bracket, High Voltage Fuse, jgtrade1, Pole Line Hardware