132kv Three Phase Tap Changer Power Transformers

China 
                        132kv Three Phase Tap Changer Power Transformers
                      manufacture and supplier

132kv Three Phase Tap Changer Power Transformers image

Get Latest Price Request a quote

Quick Details

132kv Three Phase Tap Changer Power Transformers

132kv Three Phase Tap Changer Power Transformers

Silverstone Electric

OD

Power Frequency

Power Transformer

ISO9001-2000, ISO9001

Separated Winding Transformer

Oil-immersed Type Transformer

Core-type Transformer

Three

Power, Instrument, Lighting, Rectifier

Silverstone Electric

Pallet / Wooden Case / Container

Refer to Drawings

China

Product Details

Features of 132kV Oil-immersed Transformers (33kV Large Capacity main
Transformers)
1. Low loss, therefore significantly energy-saving. The average no-load loss is 35% lower, and the load loss 10~20% lower, than
Prescribed by the present National standard GB/T 6451.
2. The core laminations are made up from imported high-quality cold-rolled grain-oriented silicon steel sheets with miter joints
And without punched holes, and are stacked without the upper yoke sheets in place. After stacking, the core is pressed
Integrally and finally glued together by epoxy resin on the cut edges, so that the three limbs and the upper and lower yokes are
Bonded together into a rigid, vertically straightened entity, together with the plate-type upper and lower frame.
3. Zigzag directed flow of oil are provided within the windings, so that all parts of the windings can be cooled more evenly, thus
Reducing the temperature rise of the windings as a whole as well as the hot-spot temperature rise, prolonging the service life
Of transformers.
4. The regulating winding is a separate winding, apart from the high voltage main winding. In this way, total ampere-turn balance
Between windings can be obtained irrespective of the tapping position; And the axial electrodynamic force during short circuit
Can be much reduced, thus upgrading the short circuit withstand capability of the transformer as a whole. All the windings are
Perfectly dried before assembly. The radial clearances between windings and between low voltage winding and core are filled
With pre-dried vertical spacers and insulating cylinders in such a way that the windings are tightly together radially with
Practically ‘zero’ allowance between them.
5. The windings of one phase are assembled into an integral phase block before placing onto the core. The low voltage winding is
Wound directly on strong thick paper cylinder. Vertical spacer strips are provided in spaces between windings and outside the
Outermost winding. The radial dimensions of all windings are kept within strict tolerance, so that a rigid winding phase block
Are obtained, capable of withstanding all the radial short-circuit forces encountered in service, and the possibility of buckling
Of the inner winding is obviated. Axially, the height of all windings is kept within close tolerance. Horizontal spacers between
Discs of a winding are pre-densified. The assembled winding phase black are pressed up and down by single support and
Pressure plates after careful adjustment of the heights of individual windings. Axial pressures are co-ordinated with the
Calculated short circuit force, so that the capability of the transformer to withstand axial short-circuit force is much increased.
6. The winding manufacture, winding assembly, and core and winding assembly work are all proceeded in totally closed clean
Rooms inside workshops. The cleanliness and temperature stability requirement of the area are the same as that required for
The manufacture of 500kV class transformers. The final vapor phase drying of the core and coil assembly is practically a further
Cleaning process.
7. Core frames in the form of a flat plate are used for clamping the core, and are joined together by side beams. The core and coil
Assembly is fixed in the tank, being positioned against the tank at six sides rigidly, such that there can be no displacement of
The assembly due to impacts during transport. Three-dimensional impact recorders are installed on transformers during
Transport to detect whether or not unacceptable impact force has been experienced and displacement of the core and coil
Assembly occurred during transportation. If not, lifting of the core and coil assembly out of the tank is not necessary. Flat cover
Permits the bushings

We are China 132kv Three Phase Tap Changer Power Transformers manufacture and supplier,You can get more details with Email,you will get cheap price or factory price.

Get Latest Price Request a quote

Popular Amorphous Transformer Products

30~500kVA 11kv 12kv 15kv Electronic Distribution Transformers

Three Phase Pad Mounted Compact Type Distribution Transformer

50-3150kVA 20kv 24kv Distribution Transformer

Single-Phase Pole Overhead Conventional Mounted Distribution Transformer

Manufacturer 11kv 630~2500kVA Distribution Transformers

Scb10-630~3150kVA 11kv Distribution Core Type Transformers

Popular Oil Transformet Products

11-33kv Sc (H) 11-30~500kVA 10kv Distribution Transformers

Type Scb10-630~3150kVA 11kv Dimension with Protection Enclosure

Step Voltage Regulator Oil Immersed

11kv Dry Type Distribution Transformer

Oil-Immersed Power Transformer 11kv 33kv

20kv 24kv Oil-Immersed Power Transformer IEC Standard

Popular Power Transformer Products

33kv Low Loss Oil-Immersed Power Transformer

11kv S11-M Sealed Transformer Factory

Pad Mount Three Phase Live Front Distribution Transformer

66kv and 69kv Rectifier Special Transformer Manufacture

Three Phase Pad Mount Mobile Power Distribution Transformer 11kv

Single Phase Overhead Step up Step Down Distribution Transformer 11kv

Popular silverstone-electric Products

33kv Arc Furnace Transformer OEM Special Transformer

10kv to 500kv Transformer Busbar Porcelain Ceramic Bushing

Rogowski Series Split Core Current Transformers Sse-Kct02

11kv Sz11 Type on-Load Tap Changing Transformer

66kv Metal Oxide Gapless Surge Arrester Station Class

33kv 38kv Oil-Immersed Power Transformer IEC Standard

Tags: , , ,

FAST AND RELIABLE SERVICE FOR YOUR PROJECT

Contact our trained experts today to find your perfect power solution.

ASK A QUESTION